United Airlines Holdroom Maintenance Program

BOWA Construction provided CMAR services for United Airlines’ Chicago O’Hare Holdroom Maintenance Program. Scope of work included the refurbishment of 50 total UAL terminal gates at ORD. Gate areas include several types of seats consisting of individual seats with adjacent charging ports and longer benches with built-in tables, as well as power bars where passengers can sit and work at laptops or other devices. The new […]
Starbucks T2

BOWA Construction provided CMAR services including the complete demolition and renovation of the existing T2 Starbucks located alongside of Delta gate E11. This fast track build-out consisted of carpentry, HVAC, electrical, plumbing, painting, glass and glazing, as well as new Starbucks brand specific interior finishes including flooring, millwork, lighting and equipment. Heavy coordination was required […]
Terminal 5 Parking

BOWA Construction is providing CMAR services for the construction of a new, six-story parking garage that will service the expanded Terminal 5, more than doubling the amount of available parking at the terminal. The post-tension parking structure will be supported by two helical ramps at the ends of the garage for movement between levels and will accommodate approximately 2,400 parking spaces, including garage space for 1700 vehicles […]
Terminal 5 Parking Garage

BOWA Construction is providing CMAR services for the construction of a new, six-story parking garage that will service the expanded Terminal 5, more than doubling the amount of available parking at the terminal. The post tension parking structure will be supported by two helical ramps at the ends of the garage for movement between levels […]
Nuts on Clark T5 O’Hare International Airport

Bowa Construction provided construction management services for the new interior retail concession build-out at Chicago’s O’Hare International Airport Terminal 5. Scope of work included demolition, carpentry, HVAC, electrical, plumbing, painting, glass and glazing, and millwork and flooring. This landslide project was completed in an occupied terminal, therefore it was imperative that effective communication and coordination […]
O’Hare International Airport Building 521 for Airport Police

Bowa Construction provided general contracting services for O’Hare International Airport’s new Building 521 for Airport Police. Located near Terminal 5 between Service and Old Cargo Road, the new facility boasts offices, detainee rooms, a processing area, restrooms, designated locker room areas and the addition of ballistic grade material for public safety. Additional scope of work […]
American Airlines G/L Gate Swap O’Hare International Airport

Bowa Construction provided construction management services for the American Airlines (AA) G/L Gate Swap project located in both Terminals 2 and 3 at O’Hare International Airport. TERMINAL 2: Scope of work consisted of demolishing the existing Air Canada baggage claim office located on Level 1 and replacing it with a new, renovated JetBlue baggage claim. […]
NE Cargo Phase III Development

Bowa Construction is providing construction management services for Aeroterm’s NE Cargo Phase III Development consisting of a single-tenant cargo handling facility including 122,637 SF of warehouse and 8,225 SF of mezzanine office space built on a 12-acre site, with the ability to provide ramp space for two Group 6 wide-body aircrafts. Additional scope of work […]
Starbucks C1 O’Hare International Airport

Bowa Construction provided construction management services including a fast track build-out of the Country’s largest airport Starbucks retail store located in Concourse C of Terminal 1 at O’Hare International Airport. Scope of work consisted of carpentry, HVAC, electrical, plumbing, painting, as well as new Starbucks brand specific interior finishes including flooring, millwork, equipment and a […]
Wicker Park Sushi O’Hare International Airport

Bowa Construction provided general contracting services including a fast track build-out for a new Wicker Park Sushi restaurant and bar located in Terminal 1 at O’Hare International Airport. Scope of work included removal of an existing Starbucks kiosk, as well as installation of new partitions, banquettes, custom millwork, floor and ceiling finishes, lighting, and new […]